Download merge block space engineers12/27/2023 ![]() ![]() ![]() IF ANY UTILITIES OR FACILITIES CONFLICT WITH PROPOSED IMPROVEMENTS, ALL WORK SHALL STOP AND THE CITY ENGINEER SHALL BE NOTIFIED IMMEDIATELY.NO TRENCHES MAY BE LEFT OPEN OVERNIGHT UNLESS APPROVED BY THE CITY ENGINEER.TO THE SATISFACTION OF THE CITY ENGINEER. DAMAGED EXISTING IMPROVEMENTS, NOT PART OF THE SCOPE OF WORK, SHALL BE PROTECTED IN-PLACE AND SHALL BE REPLACED IN KIND AT NO COST TO THE CITY,.CONTRACTOR SHALL NOTIFY AFFECTED RESIDENTS, BUSINESSES AND AGENCIES 72-HOURS PRIOR TO START OF CONSTRUCTION, AT THE DISCRETION OF THE CITY ENGINEER.OTHERWISE TRAFFIC CONTROL SHALL BE PER CA M.U.T.C.D, LATEST EDITION. OVERNIGHT TRAFFIC CONTROLS SHALL BE REVIEWED AND APPROVED BY TRAFFIC ENGINEER, PRIOR TO PRE-CONSTRUCTION MEETING.PROHIBITING PEDESTRIAN AND/OR VEHICULAR ACCESS REQUIRES DETOUR AND/OR ACCESS CLOSURE PLANS SUBJECT TO REVIEW AND APPROVAL OF THE CITY ENGINEER. PEDESTRIANS AND/OR VEHICULAR ACCESS SHALL BE ALLOWED AT ALL TIMES, UNLESS APPROVED OTHERWISE BY THE CITY ENGINEER. ![]() STAGING AREAS FOR CONSTRUCTION MATERIALS AND EQUIPMENT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.WORKING HOURS SHALL BE 9:00 AM TO 3:00 PM FOR ARTERIAL STREETS AND 7:00 AM TO 3:00 PM FOR LOCAL/RESIDENTIAL STREETS, UNLESS OTHERWISE APPROVED.THE CONTRACTOR SHALL NOTIFY THE ENGINEERING SERVICES FOR INSPECTION A MINIMUM OF 48-HRS PRIOR TO STARTING WORK AT (310) 952-1700 EXT.PRE-CONSTRUCTION MEETING SHALL BE COORDINATED AND COMPLETED THROUGH CITY OF CARSON ENGINEERING SERVICES DIVISION AT LEAST 14-DAYS PRIOR TO START OF CONSTRUCTION. (A TOTAL OF 21-DAYS PRIOR TO START OF CONSTRUCTION) CONSTRUCTION BOND IS BASED ON ESTIMATED CONSTRUCTION COST AS REVIEWED AND APPROVED BY THE CITY ENGINEER.ĬOSTRUCTION PERMIT FROM THE CITY OF CARSON ENGINEERING SERVICES DIVISION SHALL BE OBTAINED AT LEAST SEVEN (7) DAYS PRIOR TO PRE-CONSTRUCTION MEETING. (ALL LATEST EDITION) )ĬONSTRUCTION PERFORMANCE BOND SHALL BE POSTED THROUGH CITY OF CARSON ENGINEERING SERVICES DIVISION PRIOR TO CONSTRUCTION PERMIT ISSUANCE. ALL WORK AND MATERIALS SHALL COMPLY WITH THE CITY OF CARSON, STANDARD DRAWINGS, AMERICAN PUBLIC WORKS ASSOCIATION AND CALTRANS STANDARD PLANS AND SPECIFICATIONS. ![]()
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |